The integration in TFS between Builds and Work Items is just too good. In this blog post I will describe a solution based on a TFS Server Plugin to have more fine-grained control on completed builds.

Completed builds may sometimes be more valuable for the development team and only a few of them will eventually be published/deployed for (public) Testing. This means that Testers (in theory) should only be able to log bugs against these particular builds.

There are two important fields on a bug work item which may point to a build: “Found in Build” and “Integrated in Build”.

BuildQuality1

For both fields a value can be selected from a combobox. The values in the combobox are part of the global list for the builds in the active Team Project.

BuildQuality2

By default, ALL finished builds (failed + succeeded) will trigger the BuildCompletion event in the Team Project Collection and the accompanying Build Number will be appended to the existing global list for the builds in the Team Project. In Team Projects where a lot of builds are defined, this “Builds” global list will be flooded by superfluous builds which should never be selected for the above fields. CI builds for example should not be part of this global list. Only full builds which are deliberately transferred for testing should be searchable in the above comboboxes.

So, how to explicitly mark a build for “Testing”? This can be easily done with setting a Build Quality for a given build.

BuildQuality3

Note that people who want to modify the Build Quality should have the permission “Edit build quality”.

BuildQuality4

Build Quality values can also be managed in a dedicated list.

BuildQuality5

By using a specific Build Quality value, it’s also possible to create a TFS Server Plugin and to listen to a BuildQualityChangedNotification event and to only add the Build Number to the global list when the Build Quality is set to “Ready for Initial Test”. Of course, the default event-subscription for the BuildCompleted event must be disabled and the existing global list should be cleaned.

This is exactly what I did. Only the Build Numbers of the builds that get a desired Build Quality (“Ready For Initial Test”) will be pushed to the global list of the Builds in the Team Project.

When your team makes fully use of Microsoft Test Manager to file bugs, the “Found in build” field can be automatically set by associating particular builds to a Test Plan. Test execution can then be done against an approved build list. The “Integrated in build” field is normally automatically set by the build process which picks up a bug resolution through a changeset at check-in time.

BuildQuality6

BuildQuality7

Some more details how I did implement the customization of the global build list:

Delete the out-of-the-box event-subscription for the BuildCompleted event

The easiest way is actually to navigate to the event-subscription table via SQL Management Studio (tbl_EventSubscription in specific Team Project Collection database) and to delete the event-subscription row from there. But, that shortcut is not really recommended I’m afraid. A safer solution is to rely on the Bissubscribe command line tool ((executable can be found in :\Program Files\Microsoft Team Foundation Server 2010\Tools). Strange enough, there’s no option to list the existing event-subscriptions, but there certainly is an unsubscribe switch to unsubscribe from an event-subscription. You will need the ID of the event-subscription. The only way to get this ID without having to write custom code on the TFS API is to get the ID from looking into the tbl_EventSubscription table in SQL Management Studio. Note that it’s the Integer ID you will need instead of the GUID Subscriber ID.

BuildQuality8

BuildQuality9

Recreating this default event-subscription is possible through the command BisSubscribe /eventType BuildCompletionEvent /address http://:8080/tfs//WorkItemTracking/v1.0/Integration.asmx /collection http://:8080/tfs/.

Clean up the existing “Builds” global list

The global list of a Team Project Collection can be exported/imported with the witadmin command-line options or you can export/import a global list through the UI with the Process Editor from the TFS Power Tools.

BuildQuality10

You will be prompted to store the GlobalList.xml file after which you may edit the list. Delete as many ListItem entries as you want in order to clean up the Build list. This is the value list that will be used for the “Found in Build” and “Integrated in Build” fields.

BuildQuality11

Import the global list back to TFS via witadmin or the Process Editor.

BuildQuality12

To immediately witness the result, you may need to restart Visual Studio to clear the cache.

Activate the TFS Server Plugin for processing BuildQualityChangedNotification events

Since TFS 2010, it has become fairly easy to write custom event handlers that will run in the context of Team Foundation Server. It’s a plugin (dll) that needs to be deployed on the TFS Application Tier. How to accomplish this is not well documented, but your best starting point would be to read Chapter 25 of the book Professional Team Foundation Server 2010. Grant Holliday – one of the authors – explains how the ISubscriber interface can be used for extending Team Foundation Server.

For my purpose I implemented the ISubscriber interface in my BuildQualityChangedEventHandler class. The Build Quality I will use in my example is “Ready For Initial Test”. This action should append the Build Number to the Build global list of the Team Project.

BuildQuality13

Next task was to pick up the BuildQualityChangedNotificationEvent and to take action when the Build Quality was set to “Ready For Initial Test”: export global list, append the current Build Number and import the list back to TFS.

BuildQuality14

That’s it, build the assembly and drop it in the plug-in folder on all active TFS Application Tiers.

BuildQuality15

Setting the Build Quality to “Ready For Initial Test” does the trick and adds the Build Number to the Build global list for the appropriate Team Project.

BuildQuality16

As an extra, I also decided to keep the “Ready For Initial Test” builds indefinitely.

BuildQuality17

BuildQuality18

Controlling your builds with the Build Quality value in combination with a TFS Server plugin gives you a lot of power! The next step could be to trigger deployments off a Build Quality value …

About these ads

8 Responses to Managing Builds through the Build Quality value

  1. Allen Feinberg says:

    Looks really cool. Would love to get a copy of the solution file for your ISubscriber so I can start playing with this faster.

  2. Hi Allen, will need to find some time to clean up my solution and post it here.

  3. Allen Feinberg says:

    Hope you get some time to clean up that solution file. Thx!

  4. richardllb says:

    I’d also love to get my hands on the code for this – even if it’s not super-cleaned up

  5. Manoj Kaithakottil says:

    Any chance the code has been cleaned up ready to post? :)

  6. Manoj Kaithakottil says:

    Just following up if it’s ready. Thanks

  7. Danny Crone says:

    Nice blog entry, really useful

  8. […] One can be interested in marking interesting build setting the Build Quality property and automatically creating the corresponding link leveraging a tool like TFS Deployer or DYI like my friend Pieter shows in his post. […]

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

%d bloggers like this: